Geological surveys for Baltica 1

It is impossible to build an offshore wind farm without a solid geological survey. This important stage of the investment will soon be completed for the Baltica 1 project.

PGE Baltica has signed a contract to carry out geological surveys (including geotechnical and geophysical surveys) and the resulting documentation of land-sea drilling for the Baltica 1 offshore wind farm.

The contractor for the work will be a consortium of companies: Geofizyka Torun S.A., Przedsiębiorstwo Geologiczne “Geoprojekt Szczecin” Sp. z o.o. and PROJMORS – Biuro Projektów Budownictwa Morskiego Sp. z o.o.

The scope of contracted work includes piezometric and magnetometric surveys, CPTU soundings, electrical resistivity tomography, seismic refraction tomography and GPR surveys, among others.

Offshore, meanwhile, there will be at least a bathymetric survey and a sediment profiler survey, as well as CPTU sounding and seismic reflection tomography.

Więcej wpisów

Do you have any questions?

Write to us and we will try to answer them as soon as possible.